Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHaverigg Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Haverigg Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Haverigg Wind Farm (Wind , Active) Location in the UK : England, Cumbria Type of installation: Wind on/offshore: on Turbines :4 Capacity : 5.8 MW Approx Date of 1st power generation: December 2004
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
NB Haverigg III is also referred to as Heverigg 3 and 4.
Haverigg III is a replacement of the turbines installed under Haverigg I
Acting for owners Windcluster Ltd, Wind Prospect secured planning permission in August 2002 to replace five 10 year old Vestas V27-225kW turbines with four Vestas V52-850 kW machines. This will substantially increase the power generated from this well-accepted site near Millom in south Cumbria.
Haverigg II is an extension to one of the first co-operatively owned wind power developments in the UK. The site is located on a disused airfield on low lying coastal land near Millom in Cumbria.
Haverigg I The first phase (now known as Haverigg I) was developed by Windcluster Ltd., consisting of five 225kW V27 wind turbines and commissioned in 1992. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Haverigg Wincluster Haverigg Airfield Hemplands LA18 4JB England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Haverigg Repowering (Haverigg II) 1.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Copeland Borough Council
|
Site ID and Reference: |
3614 / N00001W
District:
|
Applicant: |
Windprospect
Application :
4/02/0505/0
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
0.22 |
Height of Turbines: |
|
Calculated capacity: |
1.1 |
Site Address: |
Kirksanton Airfield Part of Hemplands Farm Haverigg Millom Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
313700 / 313700
|
Development Status: |
Operational
|
Application Submitted: |
4/29/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
5/1/2004
|
This Record Last Updated: |
4/11/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Haverigg Extension Wind Farm 2.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Copeland Borough Council
|
Site ID and Reference: |
2626 / 07129W3
District:
|
Applicant: |
The Wind Company
Application :
4/91/0463/0
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.4 |
Site Address: |
Kirksanton Airfield
Part of Hemplands Farm
Haverigg
Millom
Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
313700 / 313700
|
Development Status: |
Operational
|
Application Submitted: |
5/29/1991
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/1/1998
|
This Record Last Updated: |
4/11/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Haverigg 3 Windcluster
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00143RQEN
|
Capacity: |
1700
|
Status: |
Live
|
Accreditation Date: |
5/29/1991
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Windcluster 2000 Ltd
|
Applicant Address: |
Kings House
Orchard Street
Bristol
BS1 5EH
England
|
Address: |
Haverigg 3 Windcluster
Haverigg WinclusterHaverigg AirfieldHemplands
LA18 4JB
England
|
Site Name: |
Haverigg 4 Windcluster
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00144RQEN
|
Capacity: |
1700
|
Status: |
Live
|
Accreditation Date: |
5/29/1991
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Windcluster 2000 Ltd
|
Applicant Address: |
Kings House
Orchard Street
Bristol
BS1 5EH
England
|
Address: |
Haverigg 4 Windcluster
Haverigg WinclusterHaverigg AirfieldHemplands
LA18 4JB
England
|
Site Name: |
Haverigg 3 Windcluster
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00808NWEN
|
Capacity: |
1700
|
Status: |
Live
|
Accreditation Date: |
5/29/1991
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Windcluster 2000 Ltd
|
Applicant Address: |
Kings House
Orchard Street
Bristol
BS1 5EH
England
|
Address: |
Haverigg 3 Windcluster
Haverigg WinclusterHaverigg AirfieldHemplands
LA18 4JB
England
|
|
Assumptions: Capacity: 1700kW 1.7 MW, Thus over the month Capacity * 720 hours per month = 1224 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 268 | 15.76% | Issued | 01/03/2018 | | | 432 | 25.41% | Issued | 01/02/2018 | | | 404 | 23.76% | Issued | 01/01/2018 | | | 695 | 40.88% | Issued | 01/12/2017 | | | 504 | 29.65% | Issued | 01/11/2017 | | | 554 | 32.59% | Issued | 01/10/2017 | | | 642 | 37.76% | Issued | 01/09/2017 | | | 408 | 24.00% | Issued | 01/09/2017 | | | 14 | 0.82% | Revoked | 01/08/2017 | | | 402 | 23.65% | Issued | 01/07/2017 | | | 394 | 23.18% | Issued | 01/06/2017 | | | 413 | 24.29% | Issued | 01/05/2017 | | | 279 | 16.41% | Issued | 01/04/2017 | | | 424 | 24.94% | Issued | 01/03/2017 | | | 439 | 25.82% | Redeemed | 01/02/2017 | | | 514 | 30.24% | Redeemed | 01/01/2017 | | | 346 | 20.35% | Redeemed | Dec-16 | 0 | 458 | 458 | 26.94% | Issued | Nov-16 | 0 | 291 | 292 | 17.18% | Issued | Oct-16 | 0 | 320 | 320 | 18.82% | Issued | Sep-16 | 0 | 455 | 455 | 26.76% | Issued | Aug-16 | 0 | 449 | 449 | 26.41% | Issued | Jul-16 | 0 | 386 | 386 | 22.71% | Issued | Jul-16 | 0 | 386 | 386 | 22.71% | Issued | Jun-16 | 0 | 154 | 156 | 9.18% | Issued | Jun-16 | 0 | 154 | 156 | 9.18% | Issued | May-16 | 0 | 312 | 312 | 18.35% | Issued | Apr-16 | 0 | 370 | 370 | 21.76% | Issued | Mar-16 | 0 | 282 | 282 | 16.59% | Redeemed | Feb-16 | 0 | 534 | 534 | 31.41% | Redeemed | Dec-15 | 0 | 850 | 765 | 45.00% | Redeemed | Nov-15 | 0 | 720 | 720 | 42.35% | Redeemed | Oct-15 | 0 | 266 | 268 | 15.76% | Redeemed | Sep-15 | 0 | 264 | 264 | 15.53% | Redeemed | Aug-15 | 0 | 367 | 367 | 21.59% | Redeemed | Jul-15 | 390 | 389 | 389 | 22.88% | Redeemed | Jun-15 | 319 | 321 | 321 | 18.88% | Redeemed | May-15 | 622 | 622 | 622 | 36.59% | Redeemed | Apr-15 | 343 | 343 | 343 | 20.18% | Redeemed | Mar-15 | 594 | 594 | 594 | 34.94% | Redeemed | Feb-15 | 447 | 448 | 448 | 26.35% | Redeemed | Jan-15 | 792 | 792 | 792 | 46.59% | Redeemed | Dec-14 | 703 | 703 | 703 | 41.35% | Redeemed | Nov-14 | 397 | 396 | 396 | 23.29% | Redeemed | Oct-14 | 640 | 640 | 640 | 37.65% | Redeemed | Sep-14 | 155 | 156 | 156 | 9.18% | Redeemed | Aug-14 | 555 | 554 | 554 | 32.59% | Redeemed | Jul-14 | 271 | 271 | 271 | 15.94% | Redeemed | Jun-14 | 140 | 140 | 140 | 8.24% | Redeemed | May-14 | 281 | 281 | 281 | 16.53% | Redeemed | Apr-14 | 392 | 392 | 392 | 23.06% | Redeemed | Mar-14 | 509 | 509 | 509 | 29.94% | Redeemed | Feb-14 | 598 | 598 | 598 | 35.18% | Redeemed | Jan-14 | 626 | 626 | 626 | 36.82% | Redeemed | Dec-13 | 758 | 758 | 758 | 44.59% | Redeemed | Nov-13 | 400 | 400 | 1 | 0.06% | Redeemed | Oct-13 | 424 | 424 | 424 | 24.94% | Redeemed | Sep-13 | 405 | 405 | 405 | 23.82% | Redeemed | Aug-13 | 450 | 450 | 450 | 26.47% | Redeemed | Jul-13 | 173 | 173 | 173 | 10.18% | Redeemed | Jun-13 | 256 | 255 | 255 | 15.00% | Redeemed | May-13 | 497 | 498 | 498 | 29.29% | Redeemed | Apr-13 | 486 | 486 | 486 | 28.59% | Redeemed | Mar-13 | 300 | 300 | 300 | 17.65% | Redeemed | Feb-13 | 345 | 345 | 345 | 20.29% | Redeemed | Jan-13 | 459 | 460 | 460 | 27.06% | Redeemed | Dec-12 | 538 | 537 | 537 | 31.59% | Redeemed | Nov-12 | 468 | 469 | 469 | 27.59% | Redeemed | Oct-12 | 403 | 403 | 403 | 23.71% | Redeemed | Sep-12 | 608 | 607 | 607 | 35.71% | Redeemed | Aug-12 | 293 | 293 | 293 | 17.24% | Redeemed | Jul-12 | 325 | 325 | 325 | 19.12% | Redeemed | Jun-12 | 183 | 183 | 183 | 10.76% | Redeemed | May-12 | 324 | 325 | 325 | 19.12% | Redeemed | Apr-12 | 362 | 362 | 1 | 0.06% | Revoked | Mar-12 | 300 | 301 | 301 | 17.71% | Redeemed | Feb-12 | 382 | 382 | 382 | 22.47% | Redeemed | Jan-12 | 634 | 634 | 634 | 37.29% | Redeemed | Dec-11 | 871 | 871 | 871 | 51.24% | Redeemed | Nov-11 | 558 | 558 | 558 | 32.82% | Redeemed | Oct-11 | 617 | 616 | 616 | 36.24% | Redeemed | Sep-11 | 556 | 556 | 556 | 32.71% | Redeemed | Aug-11 | 369 | 369 | 369 | 21.71% | Redeemed | Jul-11 | 233 | 233 | 233 | 13.71% | Redeemed | Jun-11 | 327 | 327 | 327 | 19.24% | Redeemed | May-11 | 696 | 697 | 697 | 41.00% | Redeemed | Apr-11 | 358 | 357 | 357 | 21.00% | Redeemed | Mar-11 | 237 | 238 | 238 | 14.00% | Redeemed | Feb-11 | 410 | 410 | 410 | 24.12% | Redeemed | Jan-11 | 339 | 339 | 339 | 19.94% | Redeemed | Dec-10 | 79 | 79 | 79 | 4.65% | Redeemed | Nov-10 | 329 | 328 | 328 | 19.29% | Redeemed |
|
Capacity: 11.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 16 m/s (35.792 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/28/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|